Meeting labor cost calculator
Estimate staff time and labor cost for one or several groups with different attendance times and hourly costs. Distinguish time allocation from extra cash payments.
Arrange agenda items continuously from a start time and optionally compare the result with a planned end.
Saved in this browser. Before changing devices, export a backup from My tools.
Items run sequentially; planned end is optional and no notifications are sent.
Agenda items run consecutively in the entered order; breaks can be separate items. Durations are estimates you provide, and the planned end is optional. Times use one local wall clock without time-zone or daylight-saving conversion. No attendees, calendar synchronization or notifications are arranged. Inputs are processed locally and plans can be saved or backed up.
Items run sequentially in the entered order; breaks can be entered as separate items. Durations are estimates entered by you.
Times use one local clock basis and do not handle time zones or daylight-saving transitions. The tool does not invite people, sync calendars or send notifications.
References:Civil Service Development Institute: meeting agenda
Make a continuous meeting agenda with start and end times for each topic and an optional target finish.
Enter a start date and time, a name and whole-minute estimate for each topic, and an optional planned end.
Add each topic duration to the previous topic end; subtract the calculated finish from the planned end if provided.
A meeting starting at 09:00 with two items of 15 and 25 minutes ends at 09:40 after consecutive intervals.
A positive difference leaves time before the planned end, while a negative difference indicates an overrun.
Times are local wall-clock values with no timezone or daylight-saving conversion. This does not schedule attendees or send notifications.
You are offline. Calculations use the version already downloaded.